Project Gallery : Roadways & sitework

Hoh River Erosion Site #2 Bank Stabilization

Location:Forks, WA
Project Dates:2014
Owner:WSDOT
Status:Complete
Project Details:

Project provides for the improvement of US 101, MP 175.69 to MP 175.95 to provide protection against erosion from the Hoh River by installing engineered log structures as river bank protection.  Also included building an access road, installing a bulk bag isolation dam, drainage, placing riprap, driving steel H-pile, structure excavation, backfilling, contour grading, planting, etc.